Ceiling Termination Detail |
Cove Base Radius |
Cove Base with Wall Coating |
Cove Base with End Stop Details |
Crack Repair |
Expansion Joint |
Floor Drain |
Floor Wall Expansion |
Floor Wall Hinge
Joint R1 |
High Containment
Flooring
Termination |
Non Moving Control Joint Treatment |
Penetration Detail 5 |
Pipe Penetration |
Shingle Cove Base
to Wall |
Slope to Drain |
Substrate Repair |
Termination Detail R1 |
Trench Sump R1 |
Unreinforced
Expansion Joint to
Floor R1 |
Unreinforced
Floor Topping
Termination R1 |
Vertical
Termination R1 |
|
|
|
|